Rail electrification to Swansea dropped by the UK Government

On 20 July the UK Government published its High Level Output Specification and Statement of Funds Available. These statutory statements set out what the Secretary of State for Transport, Chris Grayling, wants the railway in England and Wales to achieve between 2019 and 2024 during rail planning Control Period 6 (CP6).

https://assemblyinbrief.wordpress.com/2017/07/21/rail-electrification-to-swansea-dropped-by-the-uk-government/

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s